Ferma Sistemas Constructivos
es un emprendimiento argentino que investiga y desarrolla
soluciones tecnológicas en acero para el Mercosur
Noticias
Very Important Investment - 02.05.02012
At the beginning of a new era of continuous production, we have acquired an area of ​​400.000 SQF in the Industrial Area of Esperanza city.
We currently have an extensive CNC ... mas ...
New Automated Paint Booth - 02.02.2012
In order to ensure a continuous flow of painted structures according to the standards we use, even in periods of high humidity, we have acquired an automated paint booth 26 meters long and 14 meters ... mas ...
Expand the model – 04.10.2011
Due to the explosive growth of our business of designing and modeling of metal buildings, we have closed the deal with Data Design USA, and now we have 12 operating licenses in our plant. (Unique in ... mas ...
AISC provides us with the latest technology - 23.09.11
To be fully attuned to the latest technologies, constantly grasp and implement the most modern practices suggested by AISC.
This time one of our ... mas ...
New contract with BARRICK - 12.09.2011
In moments we are beginning assembly in Lama of our first contract of 1.100TT, BARRICK returned  to rely  in our structures and we start to produce Pebble  Crusher´s buildings; ... mas ...
We double the capacity - 06.09.2011
With the 2 new machines´s  FICEP acquisition, we were able to double our capacity of punching and drilling of plates up to 2 inches (P81) and cutting and ... mas ...
Process optimization - 26.07.2011
New bridge crane with a capacity of 10 tons, destined only for delivery of heavy structures and new Graco paint equipment for process optimization.
... mas ...
New Project - 11.07.2011
We are running a heavy engineering metal building on the power plant "Brigadier ... mas ...
Hyperten 260A in operation - 18.05.2011
Demonstrating our policy of continuous improvement, we are pleased to announce that today we are putting in place our new court system. The same is a plasma CNC pantograph, which used to operate a ... mas ...
Presence in the agro-industrial sector - 16.02.2011
Affirming our presence in the agro-industrial sector, FERMA SA has been selected by NIDERA SA to carry out part of the new fertilizer terminal at its plant in Puerto General San Martín, ... mas ...
CNC Training - 14.02.2011
FERMA SA continues to train its staff, this time 14 workers of the firm are in a programming and operation course of the line of drilling, punching and cutting of ... mas ...
Saint Gobain - 04.01.2011
We have completed the installation of 2 huge silos 16 meters tall and 3 in diameter, which were introduced above in a building process that we give to this company in 2008 in the industrial park ... mas ...
6456 Sq Ft of Offices - 8.11.2010
We are in full internal work, since the quality requirements of the projects that we are carrying out, force us to expand. In a few we will have 45 positions of work in our areas of engineering, ... mas ...
Beechcraft chose Ferma to protect his planes - 11.10.2010
In the recent demonstration at Buenos Aires, the American company presented four new corporate planes.
The static exhibition of the planes was done in the hangar that we constructed for ... mas ...
Tenaris - 05.10.2010
Today, again, Tenaris Siderca again rely on us for the expansion of its plant in Campana. In this case it is the ... mas ...
Equipment Acquisition - 23.09.2010
Close deals for the purchase of a Plasma Pantograph PL 30 120 Sleeping with Siemens 840 D CNC and high definition source Hypertherm HPR 260.
This new team with 4.75 meters wide by 13.120 meters ... mas ...
Volkswagen manufacturing plant - 14.09.2010
The expansion of the plant located in the city of Córdoba covers an area of approximately 29700 m2 and about 1000 tons, including two buildings, one for the expansion of the production hall and ... mas ...
Training of staff - 30.07.2010
Nine models of our staff had during all of last week a refresher course "in house" in the use of design software SDS / 2, given by a senior American company. ... mas ...
Pascua Lama Project - 29.07.2010
For more than 45 days, we are producing the first 900TT venture structures for bi Pascua Lama.
This is a direct contract with Barrick Exploration Argentinas S.A. ... mas ...
Purchase of equipment - 29.07.2010
After the arrival of new equipment FICEP combined drilling and profile cutting, three containers put into it, we are negotiating the acquisition of an underwater plasma pantograph, which accelerates ... mas ...
Proferm - 14.03.2009
Recently entered the South American market, our system Proferm simply gathers broad global experience in steel construction in height.
The columns and beams are constructed with automatically ... mas ...
Heavy projects - 14.03.2009
Our engineers have developed a variety of structural models that can respond quickly to any project, to solve the most sophisticated designs.
Where our systems are not pre-adapted to your needs, ... mas ...
Ferlight - 14.03.2009
For  large span buildings, we present our Ferlight system, which mixes a lightweight, economical and highly versatile solution.
This system has been designed with truss components, made with ... mas ...
Rapiferm C - 14.03.2009
Is the system for buildings whith small modulations of up to 8 meters between rigid frames, with or without support for cranes.
It is a high-speed erection structure, as our system Rapiferm L, ... mas ...